Provide all labor, services and materials necessary for the construction of 8-inch and 6-inch water main installed by open cut construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; abandonment of existing water main; sanitary sewer removal and replacement; storm sewer removal and replacement; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main installation as shown, specified, or required.
Attached Document :
Broadway Avenue Watermain Replacement (1).pdf